1. Initial Consultation

  • Customer Needs Assessment:

    • Discuss the customer's goals, preferences, and budget.

    • Identify specific requirements (e.g., storage, accessibility, eco-friendly features).

    • Assess the timeline for the project.

​

  • Site Visit:

    • Inspect the existing space.

    • Take measurements and note existing plumbing, electrical, and structural constraints.

2. Concept Development

Design Brainstorming:

  • Present initial ideas, sketches, or mood boards based on the customer's preferences.

  • Discuss potential styles (modern, traditional, spa-inspired, etc.), materials, and finishes.

​

Budget Alignment:

  • Provide a rough cost estimate for various design options.

Colleagues Working Together
Editorial Design

3. Detailed Design

Layout Planning:

  • Create a floor plan, showing the placement of fixtures (toilets, sinks, bathtubs, showers).

 

3D Renderings or Drawings:

  • Generate visual representations of the proposed design to help the customer visualize the outcome.

 

Selection of Fixtures & Materials: Assist the customer in selecting:

  • Sanitaryware (toilet, basin, bathtub, shower cubicle).

  • Flooring and wall tiles.

  • Lighting fixtures, mirrors, and accessories.

  • Cabinets and countertops.

 

Finalising Details:

  • Present a final design for customer approval.

4. Quotation and Purchase

Final Quotation:

  • Provide a detailed breakdown of costs, including labor, materials, fixtures, and contingencies.

 

Purchasing Materials:

  • Procure approved items and fixtures, ensuring availability and timely delivery.

 

Payment Milestones:

  • Confirm payment terms (deposit, installments, or full payment upfront).

5. Pre-Installation Preparations

Permits & Approvals:

  • Obtain any necessary permits for plumbing or structural changes.

 

Demolition (if needed):

  • Remove the existing bathroom fixtures, tiles, and other elements.

 

Plumbing & Electrical Prep:

  • Adjust or upgrade plumbing and electrical systems as per the new design.

6. Installation

  • Structural Changes (if applicable):

    • Reframe walls or adjust layouts if required.

  • Flooring & Tiling:

    • Install new tiles or flooring.

  • Fixture Installation:

    • Fit the sink, toilet, shower, or bathtub.

  • Cabinets & Countertops:

    • Install storage units and countertops.

  • Lighting & Accessories:

    • Add light fixtures, mirrors, towel racks, and other accessories.

  • Painting & Finishing:

    • Apply paint or other wall finishes to complete the aesthetic.

Modern Bathroom
Bathroom

7. Quality Checks

  • Inspection:

    • Verify that all installations are secure and properly functioning.

    • Check plumbing for leaks and ensure electrical work meets safety standards.

  • Customer Walkthrough:

    • Review the finished bathroom with the customer to ensure satisfaction.

8. Post-Installation Support

Clean-Up:

  • Remove construction debris and clean the space thoroughly.

 

Warranty & Documentation:

  • Provide warranties for fixtures and an instruction manual (if applicable).

 

Follow-Up:

  • Schedule a follow-up visit to address any issues or concerns.

Timeline Overview

  • Planning and Design: 1 - 3 days

  • Installation: 1 – 3 weeks, depending on complexity.

 

This structured approach ensures a smooth transition from concept to completion, meeting the customer's expectations while minimising delays or issues.