Ricco Bathrooms initial consultation to project completion, our team provides personalised guidance to ensure every detail aligns with the your vision.
1. Initial Consultation
-
Customer Needs Assessment:
-
Discuss the customer's goals, preferences, and budget.
-
Identify specific requirements (e.g., storage, accessibility, eco-friendly features).
-
Assess the timeline for the project.
-
​
-
Site Visit:
-
Inspect the existing space.
-
Take measurements and note existing plumbing, electrical, and structural constraints.
-
2. Concept Development
Design Brainstorming:
-
Present initial ideas, sketches, or mood boards based on the customer's preferences.
-
Discuss potential styles (modern, traditional, spa-inspired, etc.), materials, and finishes.
​
Budget Alignment:
-
Provide a rough cost estimate for various design options.
3. Detailed Design
Layout Planning:
-
Create a floor plan, showing the placement of fixtures (toilets, sinks, bathtubs, showers).
3D Renderings or Drawings:
-
Generate visual representations of the proposed design to help the customer visualize the outcome.
Selection of Fixtures & Materials: Assist the customer in selecting:
-
Sanitaryware (toilet, basin, bathtub, shower cubicle).
-
Flooring and wall tiles.
-
Lighting fixtures, mirrors, and accessories.
-
Cabinets and countertops.
Finalising Details:
-
Present a final design for customer approval.
4. Quotation and Purchase
Final Quotation:
-
Provide a detailed breakdown of costs, including labor, materials, fixtures, and contingencies.
Purchasing Materials:
-
Procure approved items and fixtures, ensuring availability and timely delivery.
Payment Milestones:
-
Confirm payment terms (deposit, installments, or full payment upfront).
5. Pre-Installation Preparations
Permits & Approvals:
-
Obtain any necessary permits for plumbing or structural changes.
Demolition (if needed):
-
Remove the existing bathroom fixtures, tiles, and other elements.
Plumbing & Electrical Prep:
-
Adjust or upgrade plumbing and electrical systems as per the new design.
6. Installation
-
Structural Changes (if applicable):
-
Reframe walls or adjust layouts if required.
-
-
Flooring & Tiling:
-
Install new tiles or flooring.
-
-
Fixture Installation:
-
Fit the sink, toilet, shower, or bathtub.
-
-
Cabinets & Countertops:
-
Install storage units and countertops.
-
-
Lighting & Accessories:
-
Add light fixtures, mirrors, towel racks, and other accessories.
-
-
Painting & Finishing:
-
Apply paint or other wall finishes to complete the aesthetic.
-
7. Quality Checks
-
Inspection:
-
Verify that all installations are secure and properly functioning.
-
Check plumbing for leaks and ensure electrical work meets safety standards.
-
-
Customer Walkthrough:
-
Review the finished bathroom with the customer to ensure satisfaction.
-
8. Post-Installation Support
Clean-Up:
-
Remove construction debris and clean the space thoroughly.
Warranty & Documentation:
-
Provide warranties for fixtures and an instruction manual (if applicable).
Follow-Up:
-
Schedule a follow-up visit to address any issues or concerns.
Timeline Overview
-
Planning and Design: 1 - 3 days
-
Installation: 1 – 3 weeks, depending on complexity.
This structured approach ensures a smooth transition from concept to completion, meeting the customer's expectations while minimising delays or issues.